inhousefyi
← Back to listings

VP of Energy Solutions - (Owner's Representative) - Data Center Construction

KALCONDallas, Texas, United States · Posted 9 days ago
Full-timeEst. 225,000 USD
Apply now

Description

The VP of Energy Solutions will serve as a senior leader responsible for the strategy, development, engineering, commercial structuring, and delivery of power infrastructure solutions supporting hyperscale and AI data center developments across North America. This role will lead the execution of both utility-connected and behind-the-meter energy solutions, oversee relationships with key utilities and industry stakeholders, and drive the successful delivery of reliable, scalable, and innovative power systems that enable accelerated data center deployment and long-term operational success.

Minimum Qualifications:

  • Bachelor’s degree in electrical engineering, Power Engineering, Energy Systems, or a related engineering discipline.
  • Advanced degree and/or professional engineering designation preferred.
  • Minimum 15 years of experience in power infrastructure, utilities, generation, transmission, or hyperscale data center development.
  • Minimum 5 years of experience in senior leadership roles.
  • Demonstrated experience delivering utility-scale and/or behind-the-meter power infrastructure projects.
  • Strong technical expertise in power systems engineering, including generation, transmission, distribution, substations, protection systems, controls, and SCADA.
  • Significant commercial experience negotiating infrastructure, energy, utility, and power supply contracts.
  • Proven ability to lead multidisciplinary engineering and commercial teams.
  • Strong strategic planning, financial analysis, risk management, and stakeholder management skills.
  • Experience supporting large-scale infrastructure project financing, technical due diligence, and customer engagements.
  • Knowledge of applicable electrical codes, utility standards, environmental regulations, and industry best practices


Duties and Responsibilities:

  • Develop and execute the company's overall power strategy for multi-site hyperscale and AI data center developments.
  • Lead the planning, development, engineering, and delivery of utility-connected and behind-the-meter power solutions.
  • Direct all utility interconnection activities, including transmission and distribution coordination, system studies, interconnection agreements, and utility negotiations.
  • Develop and implement behind-the-meter energy strategies including natural gas generation, microgrids, renewable energy systems, battery energy storage, and hybrid power solutions.
  • Lead commercial negotiations for EPC, EPCM, OEM supply, long-term service agreements, power purchase agreements, fuel supply contracts, utility agreements, and major equipment procurement.
  • Oversee electrical engineering activities related to substations, transmission systems, protection schemes, controls, SCADA systems, and overall power infrastructure design.
  • Review and approve engineering deliverables to ensure reliability, scalability, maintainability, cost optimization, and schedule compliance.
  • Establish technical standards, design criteria, engineering governance processes, and quality requirements across all projects.
  • Develop procurement strategies for long-lead electrical equipment including transformers, switchgear, generators, and high-voltage infrastructure.
  • Provide executive oversight throughout project development, construction, commissioning, energization, and commercial operation.
  • Act as executive technical lead during customer engagements and technical due diligence activities for hyperscale and AI customers.
  • Build and maintain strategic relationships with utilities, ISOs/RTOs, regulators, EPC contractors, OEMs, consultants, government agencies, and key customer stakeholders.
  • Oversee the development and implementation of Power Purchase Agreement (PPA) frameworks for behind-the-meter power solutions.
  • Support project financing activities through technical due diligence, lender presentations, cost reviews, and risk assessments.
  • Build, mentor, and lead a high-performing multidisciplinary energy, engineering, and commercial organization.
  • Ensure compliance with all applicable electrical, utility, environmental, safety, and regulatory requirements.
  • Drive continuous improvement initiatives focused on safety, reliability, resilience, innovation, and project execution excellence.
  • Provide leadership team oversight and strategic direction for energy infrastructure initiatives throughout North America.

Benefits Offered:
• Medical insurance
• Dental insurance
• Vision insurance
• Life Insurance
• Accident Insurance
• Long Term Disability
• 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
• 15 days of paid time off
• 8 paid national holidays
• Reimbursement for professional licenses and certifications

Submission Requirements:

At a minimum, the candidate’s professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company including:
    • Name & Contact Information of the firm or agency
    • Start Date and End Date (Month & Year)
    • Positions Held

At KALCON we are committed to creating an inclusive, diverse, and equitable workplace where every individual is respected and valued. We are an equal opportunity employer and all applicant and employees will receive consideration for employment as we do not tolerate discrimination of any kind based on race, color, religion, gender, sexual orientation, gender identity, national origin, age, disability, genetics, protected veteran status or any other protected characteristic as outlined by federal, state, or local laws. We believe that a diverse workforce contributes to the success of our company and the innovation behind the exceptional projects we deliver. We encourage and support applicants from all backgrounds, experiences, and perspectives to join our team and thrive. Our hiring and employment practices are guided by principles of fairness, equality, and opportunity for all.

Salary Range
$180,000$270,000 USD

Similar jobs

KALCONRemote

Est. 140,000 USD

KALCON is seeking an experienced Supply Chain Lead to serve as an Owner’s Representative supporting large-scale data center development programs across North America. This role is responsible for developing and executing…

Full-timeRemote
KALCONPortsmouth, Ohio, United States

Est. 180,000 USD

KALCON is looking for a self-starting Electrical Project Manager to drive core project coordination efforts on electrical construction scopes on mission-critical data center construction. This role oversees schedule, cos…

Full-time
KALCONEagle Mountain, Utah, United States

Est. 180,000 USD

Seeking a Mid to Senior level Project Manager to provide Owner Representation on the construction of a hyperscale data center campus in Eagle Mountain, Utah. This individual will manage various scopes during the base bui…

Full-time
KALCONPortsmouth, Ohio, United States

Est. 180,000 USD

KALCON is looking for a self-starting Project Manager to drive core project coordination efforts on low-voltage construction scopes on mission-critical data center construction projects. This role oversees schedule, cost…

Full-time
KALCONWheeler, Texas, United States

Est. 175,000 USD

KALCON is seeking an experienced Mechanical Subject Matter Expert (SME) to serve as the lead on a large-scale, mission-critical AI data center program in the Texas Panhandle. This role serves as the mechanical technical…

Full-time
KALCONHouston, Texas, United States

Est. 160,000 USD

KALCON is looking for a Cost Manager who will be responsible for managing project budgets, pay applications, EAC/forecasting, and change management across data center construction projects. This role collaborates closely…

Full-time
KALCONHouston, Texas, United States

Est. 180,000 USD

KALCON is seeking an experienced Project Manager with 7-10+ years of experience delivering complex construction projects within the data center, semiconductor, laboratory, or other mission-critical industries. As an Owne…

Full-time
KALCONHouston, Texas, United States

Est. 187,500 USD

Seeking a Construction Manager to coordinate, manage, and report on construction activities for mission‑critical facilities - Houston, TX The Construction Manager is responsible for coordinating, managing, and reporting…

Full-time
KALCONPhoenix, Arizona, United States

Est. 160,000 USD

KALCON is looking for a self-starting Design Manager who will lead multi‑disciplinary design coordination on a hyperscale data center build from concept through construction administration as an Owner’s Representative. T…

Full-time
KALCONPort Washington, Wisconsin, United States

Est. 145,000 USD

The Permit Manager serves as the Owner’s Representative responsible for planning, coordinating, tracking, and reporting all entitlement, permitting, inspection, and approval activities required to support the successful…

Full-time
KALCONBurlington, Texas, United States

Est. 180,000 USD

Seeking a Project Manager to provide Owner Representation on mechanical scopes on the construction of a data center campus - Burlington, TX KALCON is seeking a self-starting Mechanical Project Manager to lead project del…

Full-time
KALCONHouston, Texas, United States

Est. 187,500 USD

KALCON is seeking an experienced Commissioning (Cx) Project Manager with 7-10+ years of construction or commissioning experience, including at least 5 years supporting mission-critical data center projects. As an Owner's…

Full-time
KALCONShippingport, Pennsylvania, United States

Est. 125,000 USD

Seeking a Assistant Construction Manager to coordinate, manage, and report on construction activities for mission‑critical facilities - Shippingport, PA The Construction Manager is responsible for coordinating, managing,…

Full-time
KALCONQuanah, Texas, United States

Est. 180,000 USD

KALCON is seeking an experienced Substation Project Manager to lead the delivery of a high-profile data center substation project for our client, Integra. This role will be responsible for overseeing a single EPC (Engine…

Full-time
KALCONPhoenix, Arizona, United States

Est. 180,000 USD

KALCON is seeking an experienced Project Manager with 7-10+ years of experience delivering complex construction projects within the data center, semiconductor, laboratory, or other mission-critical industries. As an Owne…

Full-time
KALCONCedar Rapids, Iowa, United States

Est. 180,000 USD

Seeking a Mid to Senior level Project Manager to provide Owner Representation on the construction of a hyperscale data center campusin Cedar Rapids, IA. This individual will manage various scopes during the base build of…

Full-time
KALCONPortsmouth, Ohio, United States

Est. 100,000 USD

KALCON is looking for a self-starting Project Engineer to drive core project coordination efforts as an Owner’s Representative during the tenant fit-out of one or multiple buildings on a critical data center campus. Dail…

Full-time
KALCONEagle Mountain, Utah, United States

Est. 160,000 USD

KALCON is looking for a Cost Manager who will be responsible for managing project budgets, pay applications, EAC/forecasting, and change management across data center construction projects. This role collaborates closely…

Full-time
KALCONWilmer, Texas, United States

Est. 187,500 USD

Minimum Qualifications: Bachelor's Degree in Construction Management, Engineering, or relevant functional discipline or equivalent combination of education and experience. 3-10+ years related work Understand the Critical…

Full-time
KALCONSterling, Virginia, United States

Est. 167,500 USD

The CSA QAQC Manager serves as the General Contractor's lead quality representative responsible for planning, implementing, and managing the Quality Assurance and Quality Control (QA/QC) program for all Civil, Structural…

Full-time
KALCONPhoenix, Arizona, United States

Est. 170,000 USD

Seeking a Construction Manager to coordinate, manage, and report on construction activities for mission‑critical facilities. The Construction Manager is responsible for coordinating, managing, and reporting on constructi…

Full-time
KALCONHilliard, Ohio, United States

Est. 167,500 USD

The Field MEP QAQC Manager serves as the General Contractors Representative responsible for overseeing field quality execution across basebuild and tenant fit-out phases of hyperscale data center construction projects. T…

Full-time
KALCONAbernathy, Texas, United States

Est. 187,500 USD

Seeking a Sr. Construction Manager to coordinate, manage, and report on construction activities for mission‑critical facilities - Abernathy, TX The Sr. Construction Manager is responsible for coordinating, managing, and…

Full-time
KALCONTurkey, Texas, United States

Est. 180,000 USD

Seeking a Field Project Manager to provide Owner Representation during the tenant fit-out of multiple buildings on a data center campus - Turkey, TX Minimum Qualifications: Bachelor's degree in construction management or…

Full-time
KALCONPhoenix, Arizona, United States

Est. 140,000 USD

KALCON is seeking an experienced Safety Manager with 7-10+ years of construction safety experience supporting mission critical, data center, semiconductor, or other complex vertical construction projects. As an Owner's R…

Full-time
KALCONHouston, Texas, United States

Est. 150,000 USD

An OFCI (Owner Furnished, Contractor Installed) Equipment Manager is responsible for overseeing the entire lifecycle of equipment provided by the owner but installed by the contractor. This includes planning, procurement…

Full-time
KALCONAfton, Texas, United States

Est. 165,000 USD

The QA/QC Manager will lead the development and execution of quality control programs across complex, mission-critical construction projects. This role focuses on mainly Civil, Structural, Architectural scopes, ensuring…

Full-time
KALCONFremont, California, United States

Est. 150,000 USD

The Construction Shutdown Project Manager serves as the Owner's Representative responsible for planning, coordinating, and executing facility shutdowns and outage-driven construction activities within active semiconducto…

Full-time
KALCONCedar Rapids, Iowa, United States

Est. 180,000 USD

Seeking a Field Project Manager to provide Owner Representation during the tenant fit-out of multiple buildings on a data center campus - Cedar Rapids, IA Minimum Qualifications: Bachelor's degree in construction managem…

Full-time
KALCONHouston, Texas, United States

Est. 165,000 USD

KALCON is seeking an experienced QAQC Manager with 5-10+ years of construction experience and a strong background leading quality assurance programs on complex construction projects, preferably within mission critical or…

Full-time